Is the tile and material included?
Some bids are labor only and some include materials. A labor-only bid can look cheaper, because you still have to buy the tile, and sometimes the vanity and fixtures. Ask each contractor to list who buys what.
What is under the tile?
The waterproofing, shower base and wall surface do more for a bathroom than the tile itself. A bid that does not mention them may not include them. Ask how the shower is waterproofed.
Is demolition and haul-away in the scope?
Taking out an old tub, tile and vanity is real work. Check that demolition and disposal are written in.
What happens if rot or damage is found?
Old bathrooms often hide damage. A good bid says how it is handled: you are shown the problem, you get the cost in writing, and nothing proceeds without your approval.
Is everything in writing?
Ask for the scope, what is excluded, the payment schedule and the license number on one document. Then check the license at cslb.ca.gov.
Common questions
Why are tile bids so different from each other?
Usually because the scope differs: materials included or not, what is done under the tile, and whether demolition and repairs are in the bid.
Should I just take the lowest bid?
Compare what is included first. A lower total can leave out materials, waterproofing or repairs that you then pay for separately.
Tell us about your project.
Free in-home estimate. Pero Nenada will look at the job and put the scope in writing.

